SLUUD89 March   2025 TPSM8287B30

 

  1.   1
  2.   Description
  3.   Features
  4.   4
  5. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  6. 2Hardware
    1. 2.1 Safety Instructions
    2. 2.2 Header Information
    3. 2.3 Jumper Information
    4. 2.4 Interfaces
    5. 2.5 Test Points
  7. 3Software
  8. 4Implementation Results
    1. 4.1 Evaluation Setup
      1. 4.1.1 Ripple Measurement Setup
      2. 4.1.2 Loop Response Measurement
      3. 4.1.3 Precise Turn-on Voltage
    2. 4.2 Performance Data and Results
  9. 5Hardware Design Files
    1. 5.1 Schematics
    2. 5.2 PCB Layouts
    3. 5.3 Bill of Materials (BOM)
  10. 6Additional Information
    1. 6.1 Trademarks

Test Points

TP1/2 – VOSNS/GOSNSRegulated output voltage connections. Measure the output voltage regulation at this point.
TP3/4 – VIN/GND S+/S–Input voltage sense connections. Measure the input voltage at this point.
TP5/6 – VOUT/GND S+/S–Output voltage sense connections for efficiency measurements. Measure the output voltage at this point when calculating efficiency.
TP7 – SWSW node test point. Measure the SW node at this point. This test point is not installed.