Shut-down Sequence

AC input source turns off while the converter runs.

C1: PFC output voltage, C2: LLC stage output voltage, C3: battery charging current, C4: battery voltage

PMP31276 Shutdown and Battery Backup at
            115VAC, VBAT = 22V, ISYS = 8A Figure 3-10 Shutdown and Battery Backup at 115VAC, VBAT = 22V, ISYS = 8A