SLVT253 July   2026

 

  1.   1
  2.   Description
  3.   Resources
  4.   Features
  5.   Applications
  6. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
    4. 1.4 Safety Considerations
    5. 1.5 Dimensions
    6. 1.6 Test Setup
  7. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Thermal Images
    4. 2.4 Bode Plot
  8. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Output Voltage Ripple
    3. 3.3 Load Transients
    4. 3.4 Start-up Sequence
    5. 3.5 Shut-down Sequence
    6. 3.6 AC Waveforms
  9. 4Static Regulation
  10.   Trademarks

Required Equipment

  • AC source: California instruments 2001RP
  • Digital power meter: Vitrek PA900
  • Electronic load: HP 6063B
  • Oscilloscope: LeCroy waverunner 64Xi-A
  • Infrared thermal camera: Flir one edge pro
  • True RMS multimeter: Metrahit pro