SLVUD02A April   2025  – May 2026

 

  1.   1
  2.   Description
  3.   Features
  4.   4
  5. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
      1. 1.3.1 Negative Rail Sensing
      2. 1.3.2 Configuration for Push-Pull vs Open-Drain
    4. 1.4 Device Information
  6. 2Hardware
    1. 2.1 Power Requirements
    2. 2.2 Important Usage Notes
    3. 2.3 Connector Descriptions
  7. 3Implementation Results
    1. 3.1 Default Configuration Results
    2. 3.2 Enable and Disable
    3. 3.3 Undervoltage and Overvoltage Monitoring (MODE=0)
    4. 3.4 Window and Overvoltage Monitoring (MODE=1)
    5. 3.5 WDOb
  8. 4Hardware Design Files
    1. 4.1 Schematics
    2. 4.2 Bill of Materials (BOM)
    3. 4.3 PCB Layouts
  9. 5Compliance Information
    1. 5.1 Compliance and Certifications
  10. 6Related Documentation
  11. 7Revision History

PCB Layouts

TPS7H3xx4EVM-CVAL Top OverlayFigure 4-3 Top Overlay
TPS7H3xx4EVM-CVAL Top Solder MaskFigure 4-4 Top Solder Mask
TPS7H3xx4EVM-CVAL Layer 1 (Top)Figure 4-5 Layer 1 (Top)
TPS7H3xx4EVM-CVAL Layer 2Figure 4-6 Layer 2
TPS7H3xx4EVM-CVAL Layer 3Figure 4-7 Layer 3
TPS7H3xx4EVM-CVAL Layer 4 (Bottom)Figure 4-8 Layer 4 (Bottom)
TPS7H3xx4EVM-CVAL Bottom Solder MaskFigure 4-9 Bottom Solder Mask
TPS7H3xx4EVM-CVAL Bottom OverlayFigure 4-10 Bottom Overlay
TPS7H3xx4EVM-CVAL Drill DrawingFigure 4-11 Drill Drawing