SLVUD60A June   2025  – September 2025

 

  1.   1
  2.   Description
  3.   Features
  4.   Applications
  5.   5
  6. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
    5.     General Texas Instruments High Voltage Evaluation (TI HV EVM) User Safety Guidelines
  7. 2Hardware
    1. 2.1 Recommended Test Equipment
    2. 2.2 Jumper Information
    3. 2.3 Test Points
  8. 3Implementation Results
    1. 3.1 Evaluation Setup
      1. 3.1.1 Recommended Test Setup
    2. 3.2 Performance Data and Results
      1. 3.2.1 Waveforms
      2. 3.2.2 S2 Voltage Divider
  9. 4Hardware Design Files
    1. 4.1 Schematics
    2. 4.2 PCB Layouts
    3. 4.3 Bill of Materials (BOM)
  10. 5Revision History

Test Points

Table 2-2 Test Point and Jumper Descriptions
Test Point, Jumper Label Description
TP1 GND Primary side GND test point
TP2 VDD Primary side supply test point
TP3 EN Enable pin test point
TP4 S1 Secondary side HV+ voltage after resistor chain
TP5 SM Thermal Pin
TP6 S2 Voltage sense output test point
TP7 HV- HV– secondary side test point