SLUUCG8A June   2022  – August 2022 TPS51383

 

  1.   TPS51383 TPS51384 Evaluation Module User's Guide
  2.   Trademarks
  3. 1Introduction
  4. 2Performance Specification Summary
  5. 3External Components
  6. 4Test Setup and Results
    1. 4.1 Input and Output Connections
    2. 4.2 Start-Up Procedure
    3. 4.3 Start-Up
    4. 4.4 Shutdown
    5. 4.5 Output voltage ripple
  7. 5Board Layout
    1. 5.1 Layout
  8. 6Board Profile, Schematic, List of Materials, and Reference
    1. 6.1 Board Profile
    2. 6.2 Schematic
    3. 6.3 List of Materials
    4. 6.4 Reference
  9. 7Revision History

Start-Up Procedure

  1. Ensure that the jumper at JP2 (Enable High Control) is covered to connect VIN to pin 1 of JP3. Also ensure JP3 (Enable Control) pin 2 and 3 are covered to shunt EN to GND to disable the output.
  2. Apply appropriate input voltage to VIN (J1-1) or TP1 and GND (J1-2) or TP8. Note that the board cannot support hot plug-in. The input lines must be connected between J1 and external power source first before turning on the power source.
  3. Move the jumper at JP3 (Enable Control) from pin 2 and 3 (EN and OFF) to pin 2 and 1 (EN and ON). Make sure JP3 pin 1 and pin 2 are covered, then the output can be enabled.
  4. Apply the loading to VOUT (J2-2) or TP4 and GND (J2-1) or TP10.