JAJSFX3F august 2012 – april 2023 DLP9500
PRODUCTION DATA
To ensure long term reliability of the DLP9500, a shutdown procedure must be executed. Prior to power removal, assert the PWR_FLOAT (Table 7-2) signal and allow approximately 300 µs for the procedure to complete. This procedure assures the mirrors are in a flat state.