SBAU388D September   2021  – June 2025 TMAG5170 , TMAG5170-Q1

 

  1.   1
  2.   Description
  3.   Features
  4.   Applications
  5.   5
  6. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
  7. 2Hardware
    1. 2.1 EVM Operation
    2. 2.2 Quick Start Setup
  8. 3Software
    1. 3.1 Setup
      1. 3.1.1 Driver Installation
      2. 3.1.2 Firmware
        1. 3.1.2.1 Firmware Debug
      3. 3.1.3 GUI Setup and Usage
        1. 3.1.3.1 Initial Setup
        2. 3.1.3.2 GUI Operation
    2. 3.2 Rotate and Push Demo
    3. 3.3 Direct EVM Serial Communication
  9. 4Schematics, PCB Layout, and Bill of Materials
    1. 4.1 Schematics
    2. 4.2 PCB Layout
    3. 4.3 Bill of Materials
  10. 5Reference
    1. 5.1 Trademarks
  11. 6Related Documentation
  12. 7Revision History

EVM Operation

To use the EVM with the included TI-SCB Controller, connect the EVM as shown in Figure 2-1.

TMAG5170-Q1 EVM on TI-SCB
                    Controller Figure 2-1 EVM on TI-SCB Controller

Another option is to snap apart the TMAG5170UEVM to separate the TMAG5170A1 and TMAG5170A2 halves. Users can snap the sections apart by flexing the PCB at the indicated boundary below.

TMAG5170-Q1 TMAG5170UEVM Snap Apart
                        Edge Figure 2-2 TMAG5170UEVM Snap Apart Edge