SLUSFQ1D December 2024 – November 2026 BQ41Z90
PRODUCTION DATA
| PARAMETER | TEST CONDITIONS | MIN | TYP | MAX | UNIT | |
|---|---|---|---|---|---|---|
| V(FETON)(4)(5) | CHG/PCHG/DSG/PDSG pin voltage with respect to BAT | 6V ≤ VBAT ≤ 68V, VLD ≤ VDSG, CHG/DSG CL = 20nF, PCHG/PDSG CL = 5nF, RGS = 10MΩ, charge pump normal operation setting | 9 | 10 | 12 | V |
| V(FETON_LP)(4)(5) | CHG/PCHG/DSG/PDSG pin voltage with respect to BAT | 6V ≤ VBAT ≤68V, VLD ≤ VDSG, CHG/DSG CL = 20nF, PCHG/PDSG CL = 5nF, RGS = 10MΩ, charge pump low power mode setting | 6 | 7 | 10 | V |
| V(FET_UVLO)(4)(5) | CHG and DSG pin voltage with respect to BAT | 6V ≤ VBAT ≤ 68V, VLD ≤ VDSG, CHG/DSG CL = 20nF, RGS = 10MΩ, charge pump in normal mode setting | 4 | 5 | 7 | V |
| V(FET_UVLO_LP)(4) (5) | CHG and DSG pin voltage with respect to BAT | 6V ≤ VBAT ≤ 68V, VLD ≤ VDSG, CHG/DSG CL = 20nF, RGS = 10MΩ, charge pump UVLO at low power mode setting | 2.2 | 3 | 4 | V |
| V(SRCFOL_FETON) | DSG on voltage with respect to BAT | CHG/DSG CL = 20nF, RGS = 10MΩ, source follower mode | 0 | V | ||
| V(CHGFETOFF) | CHG/PCHG/PDSG off voltage with respect to BAT | CHG CL = 20nF, PCHG/PDSG CL = 5nF, RGS = 10MΩ, steady state value | 0.7 | V | ||
| V(DSGFETOFF) | DSG off voltage with respect to LD/PACK | CHG/DSG CL = 20nF, RGS = 10MΩ, steady state value | 0.1 | V | ||
| t(CHG/DSG_FET_ON)(3) (6) | CHG and DSG rise time | CHG/DSG CL = 20nF, RGS = 10MΩ, RGATE = 100Ω, 0.5V to 4V gate-source overdrive, charge pump high overdrive setting | 21 | 40 | µs | |
| t(CHGFETOFF)(6) | CHG fall time to BAT | CHG CL = 20nF, RGS = 10MΩ, RGATE = 100Ω, 90% to 10% of V(FETON) | 46 | 65 | µs | |
| t(DSGFETOFF)(6) | DSG fall time to LD/PACK | DSG CL = 20nF, RGATE = 100Ω, RGS = 10MΩ, 90% to 10% of V(FETON) | 2 | 20 | µs | |
| t(PCHG/PDSG_FET_ON)(2) (6) | PCHG and PDSG rise time | PCHG/PDSG CL = 5nF, RGS = 10MΩ, RGATE = 100Ω, 0.5V to 4V gate-source overdrive, charge pump high overdrive setting | 21 | 40 | µs | |
| t(PCHGFETOFF)(2) | PCHG fall time to BAT | PCHG CL = 5nF, RGS = 10MΩ, RGATE = 100Ω, 90% to 10% of V(FETON) | 150 | 250 | µs | |
| t(PDSGFETOFF)(2) (6) | PDSG fall time to LD/PACK | PDSG CL = 5nF, RGS = 10MΩ, RGATE = 100Ω, 90% to 10% of V(FETON) | 150 | 250 | µs | |
| t(CP_START)(2) | Charge pump start up time | CL = 20nF, C(CP1) = 470nF, 10% to 90% of V(FETON) | 20 | ms | ||
| C(CP1)1 | Charge pump capacitor | 100 | 470 | 2200 | nF | |