SLVSFY0A August 2021 – May 2026 TPS51488
PRODUCTION DATA
There are specific sequencing requirements for the LPDDR5 VDD1 and VDD2 rails. The TPS51488 follows the power rail sequence requirements as shown in Figure 6-1 and Figure 6-2. VDD1 is greater than VDD2 at all times during ramp up, operating, and ramp down. The VDDQ output ramps and stablizes within 35 µs after VDDQ_EN asserted.
Figure 6-1 Power Sequence, VDD1/VDD2
Versus VDD_EN
Figure 6-2 Power Sequence, VDDQ
Versus VDDQ_EN