STDA022 January   2026 MSPM0L1305

 

  1.   1
  2.   Abstract
  3.   Trademarks
  4. 1Introduction
  5. 2Background
  6. 3Procedure
  7. 4Assessment Methods and Results
    1. 4.1 Initial Data Collection
    2. 4.2 BLR With In Situ Monitoring
    3. 4.3 BLR Without In Situ Monitoring
  8. 5Summary of Results
  9. 6Conclusion
  10. 7Acknowledgements
  11. 8References
Technical White Paper

The Impact of Lead Overhang on SMT for QFN Packages