SLUAB06 January   2025 AMC131M02 , AMC3330 , ISO7731

 

  1.   1
  2.   Abstract
  3.   Trademarks
  4. 1Introduction
  5. 2Topologies for Insulation Monitoring in ESS
    1. 2.1 Single Switch Topology
      1. 2.1.1 Test Steps
    2. 2.2 Dual Switch Floating Sampling Topology
      1. 2.2.1 Test Steps
    3. 2.3 Dual Switch Sampling in High Voltage Side Topology
    4. 2.4 AC Injection Topology
  6. 3Comparison of Designs
    1. 3.1 Injection Resistance Influence on Accuracy
  7. 4Capacitor Influence on Sampling Time
    1. 4.1 How to Choose Y Capacitor
    2. 4.2 Sampling Time
  8. 5Key Devices
    1. 5.1 BQ79731-Q1
    2. 5.2 UCC33421-Q1
    3. 5.3 AMC131M02
    4. 5.4 AMC3330
    5. 5.5 ISO773x
  9. 6Topos Simulation Result and Conclusion
  10. 7Summary
  11. 8References

Dual Switch Floating Sampling Topology

Use topo2-dual switch, sampling ADC located on the low voltage side with isolated operational amplifier for high-voltage sampling and insulation monitoring. Withstand voltage or isolation requirements of the device as follows:

 Dual Switch topo, Sampling GND Float(topo2)Figure 2-8 Dual Switch topo, Sampling GND Float(topo2)
 Topo2-Communication and PE②4380VFigure 2-10 Topo2-Communication and PE②4380V
 Topo2-HV and communication④4380VFigure 2-12 Topo2-HV and communication④4380V
 Topo2-HV(BAT+/BAT-) and PE①5880VFigure 2-9 Topo2-HV(BAT+/BAT-) and PE①5880V
 Topo2-HV and LV(MCU)③4380VFigure 2-11 Topo2-HV and LV(MCU)③4380V
 Topo2-LV and Communication⑤4380VFigure 2-13 Topo2-LV and Communication⑤4380V