SLVT227 October   2025

 

  1.   1
  2.   Description
  3.   Resources
  4.   Features
  5.   Applications
  6.   6
  7. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
    4. 1.4 Safety Considerations
    5. 1.5 Dimensions
    6. 1.6 Test Setup
  8. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Thermal Images
    4. 2.4 Bode Plots
    5. 2.5 EMI
  9. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Output Voltage Ripple
    3. 3.3 Load Transients
    4. 3.4 Start-up Sequence
    5. 3.5 Shut-down Sequence
  10. 4Static Regulation
  11. 5Transformer Details
    1. 5.1 Material List
    2. 5.2 Winding Details
    3. 5.3 Schematic
    4. 5.4 Winding Instructions
    5. 5.5 Details about Core and Air Gap and Bobbin
    6. 5.6 Bobbin Mechanical Details
  12.   Trademarks

Start-up Sequence

Start-up behavior is shown in Figure 3-10 and Figure 3-11. C4: output voltage, C1: input AC voltage

PMP31375 Start-up at 230VAC and Zero
                    Load Figure 3-10 Start-up at 230VAC and Zero Load
PMP31375 Start-up at 230VAC and 4A
                    Load Figure 3-11 Start-up at 230VAC and 4A Load