SLVT230
November 2025
1
Description
Resources
Features
Applications
6
1
Test Prerequisites
1.1
Voltage and Current Requirements
1.2
Required Equipment
1.3
Considerations
1.4
Safety Considerations
1.5
Dimensions
1.6
Test Setup
2
Testing and Results
2.1
Efficiency Graphs
2.2
Efficiency Data
2.3
Thermal Images
2.4
Bode Plots
3
Waveforms
3.1
Switching
3.2
Output Voltage Ripple
3.3
Load Transients
3.4
Start-Up Sequence
3.5
Shut-down Sequence
4
Static Regulation
5
Transformer Details
5.1
Material List
5.2
Winding Details
5.3
Schematic
5.4
Winding Instructions
5.5
Details about Core, Air Gap and Bobbin
5.6
Bobbin Mechanical Details
Trademarks
1.2
Required Equipment
AC source: California instruments 2001RP
Digital power meter: Vitrek PA900
Electronic load: HP 6063B
Oscilloscope: LeCroy waverunner 64Xi-A
Infrared thermal camera
True RMS multimeter: Metrahit pro
Two elements of Yuasa NPH5-12 batteries