SLVT230 November   2025

 

  1.   1
  2.   Description
  3.   Resources
  4.   Features
  5.   Applications
  6.   6
  7. 1Test Prerequisites
    1. 1.1 Voltage and Current Requirements
    2. 1.2 Required Equipment
    3. 1.3 Considerations
    4. 1.4 Safety Considerations
    5. 1.5 Dimensions
    6. 1.6 Test Setup
  8. 2Testing and Results
    1. 2.1 Efficiency Graphs
    2. 2.2 Efficiency Data
    3. 2.3 Thermal Images
    4. 2.4 Bode Plots
  9. 3Waveforms
    1. 3.1 Switching
    2. 3.2 Output Voltage Ripple
    3. 3.3 Load Transients
    4. 3.4 Start-Up Sequence
    5. 3.5 Shut-down Sequence
  10. 4Static Regulation
  11. 5Transformer Details
    1. 5.1 Material List
    2. 5.2 Winding Details
    3. 5.3 Schematic
    4. 5.4 Winding Instructions
    5. 5.5 Details about Core, Air Gap and Bobbin
    6. 5.6 Bobbin Mechanical Details
  12.   Trademarks

Required Equipment

  • AC source: California instruments 2001RP
  • Digital power meter: Vitrek PA900
  • Electronic load: HP 6063B
  • Oscilloscope: LeCroy waverunner 64Xi-A
  • Infrared thermal camera
  • True RMS multimeter: Metrahit pro
  • Two elements of Yuasa NPH5-12 batteries