SLVUDO4 November   2026

 

  1.   1
  2.   Description
  3.   Get Started
  4.   Features
  5.   Applications
    1.     6
  6. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specifications
    4. 1.4 Device Information
  7. 2Hardware
    1. 2.1 Header Information
    2. 2.2 Jumper Information
    3. 2.3 Equipment
    4. 2.4 Hardware Setup
  8. 3Software
    1. 3.1 Software Setup
      1. 3.1.1 EV2400 Setup
      2. 3.1.2 USB2ANY Setup
    2. 3.2 Test Procedure
      1. 3.2.1 Initial Power Up
      2. 3.2.2 I2C Register Communication Verification
      3. 3.2.3 Charger Mode Verification
      4. 3.2.4 Helpful Tips
  9. 4Hardware Design Files
    1. 4.1 Schematic
    2. 4.2 PCB Layout
      1. 4.2.1 PCB Layout Guidelines
    3. 4.3 Bill of Materials (BOM)
  10. 5Additional Information
    1. 5.1 Trademarks

Charger Mode Verification

Use the following steps for charger mode verification:

  1. PS #1 is on from Section 3.2.1. In the EVM software, click the Read Register button twice.
    • Verify that all Fault statuses read Normal.
      BQ25350EVM
  2. To confirm SYS voltage regulation, enable Load #1 (see Section 2.4) and take DMM measurements as follows:
    • Measure → VSYS (SYS-TP12 and PGND-TP20 or TP22) = 3.52V ±0.3V.
    • Measure → VBAT (BAT-TP11 and PGND-TP20 or TP22) = 2.5V ±0.2V.
    • Measure → IBAT = 1000mA ±100mA.
  3. To confirm battery charge current regulation, change Load #1 to 3.7V and take DMM measurements as follows:
    • Measure → VSYS (SYS-TP12 and PGND-TP20 or TP22) = 3.8V ±0.3V.
    • Measure → VBAT (BAT-TP13 and PGND-TP20 or TP22) = 3.7V ±0.2V.
    • Measure → IBAT = 1000mA ±100mA.
  4. To confirm input voltage limit operation, in the EVM software on the 16-bit tab, set input voltage limit (VINDPM) to 4800mV and then take DMM measurement ( or PS #1 measurement if accurate) as follows:
    • Measure → VIN = 4800mV ±300mV.