Use the following list to set up the EVM
testing equipment:
- Review EVM jumper connections in Table 2-2.
- Set PS #1 for 5V DC, 2A current limit and
then turn off the supply.
- Connect the output of PS#1 in series with a current meter to J1 (VIN and
PGND).
- Connect a voltage meter across TP8 (VBUS)
and TP21 (PGND), or across J1.
- Turn on Load #1, set to constant voltage mode, and output to 2.5V.
Disable Load. Connect Load in series with a current meter (multimeter), ground side, to J3
(BAT+ and PGND) as shown in Figure 2-1 if not using a source meter with current measuring capabilities.
- Connect a voltage meter across TP11 (BAT)
and TP22 (PGND), or across J3-3 and J3-1 as in Figure 2-1.
- Connect a voltage meter across TP12 (SYS)
and TP27 (PGND), or across J2-2 and J2-1 as in Figure 2-1.
- Connect the EV2400 USB interface board to
the computer with a USB cable and from I2C port to J6 with the 4-pin cable as in Figure 2-1.
For USB2ANY interface, connect the
ribbon cable to J5 and the USB cable to the computer as in Figure 2-1.
- Install shunts as shown in Table 2-2. Note that the shunts in Figure 2-1 are not necessarily installed per the table.