SNOSB24C October 2008 – November 2025 LM5576-Q1
PRODUCTION DATA
The capacitor at the SS pin determines the soft-start time, that is, the time for the reference voltage and the output voltage, to reach the final regulated value. Equation 14 determines the time.

For this application, a C4 value of 0.01 µF was chosen which corresponds to a soft-start time of 1 ms.