SPRSP36L September 2021 – June 2026 TDA4VM , TDA4VM-Q1
PRODUCTION DATA
I/O timing requirements and switching characteristics are not applicable when OSPI is used with data training. Follow the Section 8.3.2, OSPI and QSPI Board Design and Layout Guidelines section to ensure proper operation.