DLPS289A June 2025 – September 2025 DLP391TP
PRODUCTION DATA
The following power supplies are all required to operate the DMD:
DMD power-up and power-down sequencing is strictly controlled by the DLP display controller.
For reliable operation of the DMD, the following power supply sequencing requirements must be followed. Failure to adhere to any of the prescribed power-up and power-down requirements may affect device reliability. See the DMD power supply sequencing requirements in Figure 8-1.
VBIAS, VDD, VDDA, VOFFSET, and VRESET power supplies must be coordinated during power-up and power-down operations. Failure to meet any of the below requirements results in a significant reduction in the DMD reliability and lifetime. Common ground VSS must also be connected.
| SYMBOL | PARAMETER | DESCRIPTION | MIN | TYP | MAX | UNIT |
|---|---|---|---|---|---|---|
| tDELAY1(1) | Power up delay requirement | from VOFFSET settled at recommended operating voltage to VBIAS and VRESET power up | 2 | ms | ||
| tDELAY2(1) | Power down delay requirement | Delay VDD must be held high from VOFFSET, VBIAS and VRESET powering down. | 50 | us | ||
| VOFFSET | Supply voltage level | at beginning of power-up sequence delay | 6 | V | ||
| VBIAS | Supply voltage level | at end of power-up sequence delay | 6 | V |