SBVS257 March 2025 TPS7A56
PRODUCTION DATA
The device features a programmable, monotonic, current-controlled, soft-start circuit. This circuit uses the CNR/SS capacitor to minimize inrush current into the output capacitor and load during start-up. This circuitry reduces the start-up time for applications that require the output voltage to reach at least 90% of the set value for fast system start-up. See the Soft-Start, Noise Reduction (NR/SS Pin), and Power-Good (PG Pin) section for more details.