SLUUD49 August   2024

 

  1.   1
  2.   Description
  3.   Get Started
  4.   Features
  5.   Applications
  6.   6
  7. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  8. 2Hardware
    1. 2.1 Setup
      1. 2.1.1 Connector Descriptions
      2. 2.1.2 Hardware Setup
  9. 3Hardware Design Files
    1. 3.1 Schematic
    2. 3.2 Board Layout
      1. 3.2.1 Modifications
        1. 3.2.1.1 Input and Output Capacitors
        2. 3.2.1.2 Feedforward Capacitor
    3. 3.3 Bill of Materials
  10. 4Additional Information
    1. 4.1 Trademarks
  11. 5Related Documentation

Hardware Setup

To operate the EVM, set jumper JP1 to the desired positions per Section 2.1.1. Connect the input supply to J1 and connect the load to J2.