SLVAEI5A december 2019 – june 2023 TPS25830-Q1 , TPS25830A-Q1 , TPS25831-Q1 , TPS25840-Q1
This application is the same as the application in Section 3.1, this case also can be summarized as the following:
Application 1: Figure 3-13 shows the test setup. First, power off the power supply, then short VOUT/DP_IN/DM_IN to VBAT. The state at each point is the following:
Figure 3-13 VOUT/DP_IN/DM_IN Short-to-VBAT Test SetupApplication 2: Figure 3-14 shows the test setup. First, short VOUT/DP_IN/DM_IN to VBAT, then power on the power supply.
Figure 3-14 VOUT/DP_IN/DM_IN Short-to-VBAT Test SetupApplication 3: Figure 3-15 shows the test setup. Short VOUT/DP_IN/DM_IN to VBAT and power on the power supply, then enable EN.
Figure 3-15 VOUT/DP_IN/DM_IN Short-to-VBAT Test Setup