SLUUCU7 November   2023 BQ25960H

 

  1.   1
  2.   Description
  3.   Get Started
  4.   Features
  5.   Applications
  6.   6
  7. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  8. 2Hardware
    1. 2.1 Equipment
    2. 2.2 Equipment Setup
    3. 2.3 I/O Descriptions
  9. 3Software
    1. 3.1 Software Setup
  10. 4Implementation Results
    1. 4.1 Test Procedure
      1. 4.1.1 Initial Settings
      2. 4.1.2 Communication Verification
      3. 4.1.3 Switched Cap Mode Charge Verification
      4. 4.1.4 Bypass Mode Charge Verification
      5. 4.1.5 Dual BQ25960H Operation
      6. 4.1.6 BQ25611D Charge Verification
  11. 5Hardware Design Files
    1. 5.1 Schematic
    2. 5.2 PCB Layout Guidelines
      1. 5.2.1 Board Layout
    3. 5.3 Bill of Materials
  12. 6Additional Information
    1.     Trademarks

Software Setup

Download the latest version of BQStudio. Double click the Battery Management Studio installation file and follow the installation steps. The software supports Microsoft® Windows® XP, 7, and 10 operating systems. Launch BQStudio and select Charger, as shown below.


GUID-6E2A4164-94FF-432C-8436-A3D27C34E3DA-low.png

Next, select the BQ25960H configuration file, and BQStudio opens. If only the BQ25960H is being evaluated, then the user can select the more streamlined "Charger_2_00-bq25960H.bqz" file. If the BQ25960H and the BQ25611D must be evaluated alongside each other, then the user can select the "Charger_2_00-bq25960H_EVM.bqz" file instead, which contains separate tabs to communicate with U1, U2, and U4, as shown below.

GUID-20201218-CA0I-F9CS-LWXH-6GL0RLFKKTRJ-low.png

If you do not have the BQ25960H configuration files, then please request the files through E2E. The .bqz configuration files must be saved into C:\XXX\BatteryManagementStudio\config, where XXX is the directory you selected to install BQStudio.