SLUUCU7 November   2023 BQ25960H

 

  1.   1
  2.   Description
  3.   Get Started
  4.   Features
  5.   Applications
  6.   6
  7. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  8. 2Hardware
    1. 2.1 Equipment
    2. 2.2 Equipment Setup
    3. 2.3 I/O Descriptions
  9. 3Software
    1. 3.1 Software Setup
  10. 4Implementation Results
    1. 4.1 Test Procedure
      1. 4.1.1 Initial Settings
      2. 4.1.2 Communication Verification
      3. 4.1.3 Switched Cap Mode Charge Verification
      4. 4.1.4 Bypass Mode Charge Verification
      5. 4.1.5 Dual BQ25960H Operation
      6. 4.1.6 BQ25611D Charge Verification
  11. 5Hardware Design Files
    1. 5.1 Schematic
    2. 5.2 PCB Layout Guidelines
      1. 5.2.1 Board Layout
    3. 5.3 Bill of Materials
  12. 6Additional Information
    1.     Trademarks

Initial Settings

Use the following steps to enable the EVM test setup.

  1. Make sure the steps in Section 2.2 and Section 3.1 have been followed.
  2. Turn on PS1 and Load #1:
    • Measure → VVAC1-GND(TP1 and TP37) = 8.3 ± 0.2 V
    • Measure → VVBUS_M-GND(TP2 and TP37) = 0 ± 0.5 V
    • Measure → VVOUT_M-GND(TP5 and TP37) = 4 ± 0.2 V