SLUUCV0B August   2023  – April 2024 TPSM8287A06 , TPSM8287A12 , TPSM8287A15

 

  1.   1
  2.   Description
  3.   Features
  4.   4
  5. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  6. 2Hardware
    1. 2.1 Safety Instructions
    2. 2.2 Header Information
    3. 2.3 Jumper Information
    4. 2.4 Interfaces
    5. 2.5 Test Points
  7. 3Software
  8. 4Implementation Results
    1. 4.1 Evaluation Setup
      1. 4.1.1 Ripple Measurement Setup
      2. 4.1.2 Operation With Output Voltages Above 2V
      3. 4.1.3 Loop Response Measurement
      4. 4.1.4 Precise Turn-on Voltage
    2. 4.2 Performance Data and Results
  9. 5Hardware Design Files
    1. 5.1 Schematics
    2. 5.2 PCB Layouts
    3. 5.3 Bill of Materials (BOM)
  10. 6Additional Information
    1. 6.1 Trademarks
  11. 7Revision History

Test Points

TP1/2 – VOUT/GND

Output voltage sense connections. Measure the output voltage at this point.

TP3/4 – VIN/GNDInput voltage sense connections. Measure the input voltage at this point.

TP5 – SW

SW node test point. Measure the SW node at this point. This test point is not installed.