SLVUDE3 August   2025

 

  1.   1
  2.   Description
  3.   Get Started
  4.   Features
  5.   Applications
  6.   6
  7. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 General Safety Information
    5. 1.5 Hardware
      1. 1.5.1 IO and Jumper Descriptions
  8. 2Software
    1. 2.1 Communication Interface Setup
      1. 2.1.1 BQSTUDIO using EV2400
  9. 3BQ24810 EVM Evaluation
    1. 3.1 Equipment
    2. 3.2 Equipment Setup
    3. 3.3 BQ24810 EVM Test Procedure
      1. 3.3.1 AC Adapter Detection Threshold
      2. 3.3.2 Charger Parameter Settings
      3. 3.3.3 Charge Current and AC Current Regulation (DPM)
      4. 3.3.4 Hybrid Boost Mode
      5. 3.3.5 Battery-only Boost Mode
      6. 3.3.6 Power Path Selection
  10. 4Hardware Design Files
    1. 4.1 Schematic
    2. 4.2 BQ24810EVM PCB Layouts
    3. 4.3 Bill of Materials
  11. 5Additional Information
    1. 5.1 Trademarks

AC Adapter Detection Threshold

Use the following steps for AC adapter detection threshold:

  1. Make sure that the Equipment Setup steps are followed.
  2. Turn on PS#1

    Load #1 and Load #2 are not connected during this step.

  3. Increase the output voltage of PS#1 to 20.0V
    1. Measure → V[TP23(VCC)] = 19.6V ±0.5V
    2. Measure → V[TP12(ACDET)] = 2.7V ±0.1V
    3. Measure → V[TP13(ACOK)] = 3.3V ±0.1V
    4. Measure → V[TP3(SYS)] = 20.0V ±0.5V
    5. Measure → V[TP22(REGN)] = 6V ±0.6V
    6. Measure → V[TP20(ILIM)] = 0.79V ±0.1V