9 Revision History
Changes from Revision A (April 2025) to Revision B (May 2025)
- Added Trace Length Mismatch Between Loads sectionGo
Changes from Revision * (August 2024) to Revision A (April 2025)
- Updated the numbering format for tables, figures, and cross-references throughout the document Go
- Added Simulation Setup sectionGo
- Updated single-line termination imagesGo
- Updated star-line termination imagesGo
- Updated split line termination
imagesGo
- Updated imageGo
- Added Lab Measurement Setup sectionGo
- Added Lab Measurement Results and Correlation to Simulation
Data sectionGo
- Added Application Example: FPD-Link sectionGo
- Added additional detail to guidelines and general recommendations for driving
multiple loadsGo
- Added CDC6Cx data sheet referenceGo