SLVSGI9A october 2022 – july 2023 DRV8411A
PRODUCTION DATA
Refer to the PDF data sheet for device specific package drawings
There is no specific sequence for powering up the DRV8411A. The presence of digital input signals is acceptable before VM is applied. After VM is applied to the DRV8411A, the device begins operation based on the status of the control pins.