JAJSLB2E November 2014 – May 2025 DLP9500UV
PRODUCTION DATA
To ensure long-term reliability of the DLP9500UV, a shutdown procedure must be executed. Prior to power removal, assert the PWR_FLOAT (Table 7-2) signal and allow approximately 300µs for the procedure to complete. This procedure ensures the mirrors are in a flat state.