SLVUDA2 July   2025

 

  1.   1
  2.   Description
  3.   Get Started
  4.   Features
  5.   Applications
  6.   6
  7. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  8.   General Texas Instruments High Voltage Evaluation (TI HV EVM) User Safety Guidelines
  9. 2Hardware
    1. 2.1 Power Requirements
    2. 2.2 Test Points
    3. 2.3 Setup
      1. 2.3.1 Reference Voltage
        1. 2.3.1.1 Configuration 1: REFA and REFB = GND
        2. 2.3.1.2 Configuration 2: OPA CH A Bias REFA and REFB
        3. 2.3.1.3 Configuration 3: REFA and REFB Bias Independently
      2. 2.3.2 Current Sensing
      3. 2.3.3 Input Filtering
      4. 2.3.4 Output Load
    4. 2.4 Best Practices
  10. 3Hardware Design Files
    1. 3.1 Schematic
    2. 3.2 PCB Layouts
    3. 3.3 Bill of Materials (BOM)
  11. 4Additional Information
    1. 4.1 Trademarks
    2. 4.2 Related Documentation

PCB Layouts

INA1H94EVM Top Layer Silkscreen Figure 3-1 Top Layer Silkscreen
INA1H94EVM Top Layer Mask Figure 3-2 Top Layer Mask
INA1H94EVM GND Layer Mask Figure 3-3 GND Layer Mask
INA1H94EVM Power Layer Mask Figure 3-4 Power Layer Mask
INA1H94EVM Bottom Layer Silkscreen Figure 3-5 Bottom Layer Silkscreen
INA1H94EVM Bottom Layer Mask Figure 3-6 Bottom Layer Mask