SPRSP69D July 2023 – August 2025 TMS320F28P650DH , TMS320F28P650DK , TMS320F28P650SH , TMS320F28P650SK , TMS320F28P659DH-Q1 , TMS320F28P659DK-Q1 , TMS320F28P659SH-Q1
PRODUCTION DATA
| PARAMETER | TEST CONDITIONS | MIN | TYP | MAX | UNIT | |
|---|---|---|---|---|---|---|
| VVREG | Internal Voltage Regulator Output | 1.14 | 1.2 | 1.26 | V | |
| VVREG-PU | Internal Voltage Regulator Power Up Time | 350 | us | |||
| VVREG-INRUSH(5) | Internal Voltage Regulator Inrush Current | 1150 | mA | |||
| VPOR-VDDIO | VDDIO Power on Reset Voltage | Before and After XRSn Release | 2.3 | V | ||
| VBOR-VDDIO-UP(1) | VDDIO Brown Out Reset Voltage on Ramp Up | Before XRSn Release | 2.7 | V | ||
| VBOR-VDDIO-DOWN(1) | VDDIO Brown Out Reset Voltage on Ramp Down | After XRSn Release | 2.81 | 3.0 | V | |
| VPOR-VDD-UP(2) | VDD Power on Reset Voltage on Ramp Up | Before XRSn Release | 1 | V | ||
| VPOR-VDD-DOWN(2) | VDD Power on Reset Voltage on Ramp Down | After XRSn Release | 1 | V | ||
| VXRSn-PU-DELAY(3) | XRSn Release Delay after Supplies are Ramped Up During Power-Up | Internal VREG | 40 | us | ||
| VXRSn-PU-DELAY(3) | XRSn Release Delay after Supplies are Ramped Up During Power-Up | External VREG | 320 | us | ||
| VXRSn-PD-DELAY(4) | XRSn Trip Delay after Supplies are Ramped Down During Power-Down | 2 | us | |||
| VDDIO-MON-TOT-DELAY | Total Delays in Path of VDDIO Monitors (POR, BOR) | 80 | us | |||
| VXRSn-MON-RELEASE-DELAY | XRSn Release Delay after a VDD POR Event | Internal VREG, Supplies Within Operating Range | 40 | us | ||
| XRSn Release Delay after a VDDIO BOR | 40 | us | ||||
| XRSn Release Delay after a VDDIO POR Event | 120 | us | ||||
| XRSn Release Delay after a VDD POR Event | External VREG, Supplies Within Operating Range | 360 | us | |||
| XRSn Release Delay after a VDDIO BOR | 360 | us | ||||
| XRSn Release Delay after a VDDIO POR Event | 440 | us | ||||