TIDUFG0
November 2025
1
Description
Resources
Features
Applications
6
1
System Description
2
System Overview
2.1
Block Diagram
2.1.1
PCB Rogowski Coils
2.1.2
Integrator Stage
2.1.3
Input Stage
2.1.4
Differential Amplifier Stage
2.1.5
High-Bandwidth, Low-Noise Amplifier Stage
2.1.5.1
Hybrid Integrator
2.1.5.2
Band Pass Filter
2.1.5.3
Logarithmic Amplifier
2.2
Design Considerations
2.2.1
Component Selection
2.2.2
RC Component Selection
2.2.3
Gain Setting
2.3
Highlighted Products
2.3.1
INA333
2.3.2
TLV9002
2.3.3
LM2664
2.3.4
TLV2387
2.3.5
LOG300
2.3.6
TL081H
3
Hardware, Software, Testing Requirements, and Test Results
3.1
Hardware Requirements
3.2
Test Setup
3.2.1
Metering Setup
3.2.1.1
Accurate Current Source
3.2.1.2
TIDA-010987
3.2.1.3
ADS131M08 Metrology Evaluation Module
3.2.1.4
GUI
3.2.2
5kHz to 50kHz Band Pass and Logarithmic Amplifier Test Setup
3.2.2.1
Oscilloscope
3.2.2.2
Function Generator
3.3
Test Results
3.3.1
No Load Conditions
3.3.1.1
Objective
3.3.1.2
Setup
3.3.1.3
Requirements
3.3.1.4
Results
3.3.2
Starting Load Test
3.3.2.1
Objective
3.3.2.2
Setup
3.3.2.3
Requirements
3.3.2.4
Results
3.3.3
Active Power Measurements
3.3.3.1
Objective
3.3.3.2
Setup
3.3.3.3
Requirements
3.3.3.4
Results
3.3.4
Variation of Power factor
3.3.4.1
Objective
3.3.4.2
Setup
3.3.4.3
Requirements
3.3.4.4
Results
3.3.5
Variation of Voltage Test
3.3.5.1
Objective
3.3.5.2
Setup
3.3.5.3
Requirements
3.3.5.4
Results
3.3.6
Variation of Frequency
3.3.6.1
Objective
3.3.6.2
Setup
3.3.6.3
Requirements
3.3.6.4
Results
3.3.7
Band Pass
3.3.7.1
Objective
3.3.7.2
Setup
3.3.7.3
Requirements
3.3.7.4
Results
3.3.8
Logarithmic Amplifier
3.3.8.1
Objective
3.3.8.2
Setup
3.3.8.3
Requirements
3.3.8.4
Results
4
Design and Documentation Support
4.1
Design Files
4.1.1
Schematics
4.1.2
BOM
4.1.3
PCB Layout Recommendations
4.1.3.1
Layout Prints
4.2
Tools
4.3
Documentation Support
4.4
Support Resources
4.5
Trademarks
5
About the Author
3.3.2.3
Requirements
Observe the following requirements for the initial load operation test:
The meter must stay in continuous operation during the entire test.
This test must pass in both energy directions.