DLPS206 May 2021 DLPC7540
PRODUCTION DATA
| PARAMETER | MIN | MAX | UNIT | ||
|---|---|---|---|---|---|
| ƒclock | Clock frequency, TCK | 8.33 | MHz | ||
| tclock | Clock period, TCK | 120 | ns | ||
| tw(H) | Pulse duration low, TCK | 50% reference points | 50 | ns | |
| tw(L) | Pulse duration high, TCK | 50% reference points | 50 | ns | |
| ts | Setup time – TDI valid before TCK↑ | 50% reference points | 15 | ns | |
| th | Hold time – TDI valid after TCK↑ | 50% reference points | 15 | ns | |
| ts | Setup time – TMS2 valid before TCK↑ | 50% reference points | 15 | ns | |
| th | Hold time – TMS2 valid after TCK↑ | 50% reference points | 15 | ns | |
| tt | Transition time (tr and tf | 20% to 80% reference points | 5 | ns | |
| tdelay | Output delay, TCK↓ to TDO2 | 0 | 15 | ps | |
Figure 6-20 Timing Diagram for JTAG ARM Multi-Ice