The recommended sequence of tests follow:
- Test of the board switches and measurement
functionality (Lab 1 and 2)
- Test of DC/DC operation with low voltage and open
loop (Lab 3 and 4)
- Test of DC/DC operation with low voltage and
closed loop (Lab 5)
- Test of DC/DC operation with high voltage and
closed loop (Lab 5)
- Test of DC/AC operation with low voltage (Lab 6,
7, 8)
- Test of DC/AC operation with high voltage (Lab 6,
7, 8)
- Test of PV to AC operation with high voltage (Lab
8, 9)