SNVSCB5B March 2022 – May 2025 TPS388R0-Q1
PRODUCTION DATA
Sequence Monitoring 2 is very similar to Sequence Monitoring 1, however, an extra step is taken when exiting this transitioning state depending on the TEST_CFG.AT_SHDN register bit.
Sequence Monitoring 2 is entered when ACT transitions 1→0. The actions taken are described in Section 7.4.3.4.1.