SLOSE88A December 2024 – March 2025 TAS6754-Q1
PRODUCTION DATA
The Short-to-Power (S2P) tests triggers a fault condition if there is a conductive path from output pin OUT_(i)M or OUT_(i)P of the tested channel (i) to a power rail with an impedance below that specified in the Electrical Characteristics section.