SLUSG21A May 2025 – September 2025 UCC25661
PRODUCTION DATA
The soft start ramp is internally generated in the UCC25661. A fixed maximum soft start time of 25ms is internally generated to reduce inrush current at start-up, while allowing a fast output-voltage ramp up.