SBAU431A July   2024  – October 2026

 

  1.   1
  2.   Description
  3.   Get Started
  4.   Features
  5.   Applications
  6.   6
  7. 1Evaluation Module Overview
    1. 1.1 Introduction
    2. 1.2 Performance Development Kit Contents
    3. 1.3 Specification
    4. 1.4 Device Information
  8. 2Hardware
    1. 2.1  EVM Analog Input Options
    2. 2.2  Common-Mode Amplifier
    3. 2.3  Analog Input Circuit
    4. 2.4  RTD Current Source
    5. 2.5  Voltage Reference
    6. 2.6  ADC Connections and Decoupling
    7. 2.7  Power Supplies
    8. 2.8  SYNC / Clock Divide Circuit
    9. 2.9  Clocking
    10. 2.10 Serial Interface
    11. 2.11 EEPROM
    12. 2.12 Using the ADS1282EVM With an External Controller
  9. 3Software
    1. 3.1 Software Description
    2. 3.2 ADS1282 EVM Software Installation
  10. 4Implementation Results
    1. 4.1 EVM Operation
      1. 4.1.1 Evaluation Setup
      2. 4.1.2 EVM Register Settings
        1. 4.1.2.1 Channel Configuration
        2. 4.1.2.2 PGA Gain Selection
        3. 4.1.2.3 Data Rate Configuration
      3. 4.1.3 Time Domain Display
      4. 4.1.4 Spectral Analysis Display
      5. 4.1.5 Histogram Analysis Display
      6. 4.1.6 GUI Data Export
  11. 5Hardware Design Files
    1. 5.1 Schematics
    2. 5.2 PCB Layouts
    3. 5.3 Bill of Materials (BOM)
  12. 6Additional Information
    1. 6.1 Trademarks
  13. 7Related Documentation
    1. 7.1 Supplemental Content
  14. 8Revision History

Schematics

Figure 5-1 to Figure 5-4 show the complete ADS1282EVM schematic.
ADS1282V2EVM-PDK ADS1282EVM Analog Inputs and Reference
          Schematic Figure 5-1 ADS1282EVM Analog Inputs and Reference Schematic
ADS1282V2EVM-PDK ADS1282EVM
          Power Schematic Figure 5-2 ADS1282EVM Power Schematic
ADS1282V2EVM-PDK ADS1282EVM
          Digital Interface and Clocking Schematic Figure 5-3 ADS1282EVM Digital Interface and Clocking Schematic
ADS1282V2EVM-PDK ADS1282EVM
          Hardware Figure 5-4 ADS1282EVM Hardware