SLVSHK7A March 2025 – December 2025 TPS65214
PRODUCTION DATA
The data on the SDA line must be stable during the HIGH period of the clock signal (SCL). In other words, the state of the data line can only be changed when clock signal is LOW.
Figure 7-8 Data Validity Diagram