SPRUJ52E June 2022 – September 2025 AM69 , AM69A , TDA4AH-Q1 , TDA4AP-Q1 , TDA4APE-Q1 , TDA4VH-Q1 , TDA4VP-Q1 , TDA4VPE-Q1
The SMS LBIST test is run at power on (POST), checking of MISR results is all that is required.
| Register Name |
|---|
| CTRL_MMR_CFG0_WKUP_POST_STAT |