SPRUJ55D September 2023 – July 2025 AM263P2 , AM263P2-Q1 , AM263P4 , AM263P4-Q1
This block generates the signals and data to OPMISR controller based on the test type and scan chain depth. The sequence of operation per interval is defined in Section 13.6.5.3.5.